Ms. Amanda Mueller | Process Safety Consultant
Ms. Mueller is a graduate from the University of Missouri with a degree in Chemical Engineering. She has extensive experience with Relief Systems and Flare Design projects. Over the past three years, Amanda has been an invaluable addition to Smith & Burgess' engineering staff and consistently exhibits the firm's dedication to quality process safety management.
Read More
Topics:
Smith & Burgess News,
Relief System Design,
Relief Valve Mitigation,
Mitigation,
Flare Header Analysis,
Employee Spotlight
The Opportunity:
A recent Layers of Protection Analysis (LOPA) of a cavern storage facility identified several equipment installations requiring safety system upgrades. While the facility management wanted to follow proper review procedures, these proposed mitigation options seemed excessive. As a result, the site hired Smith & Burgess to review the safety systems upgrades to ensure the installations were needed and met regulatory requirements.
Read More
Topics:
Action Item Resolution,
Case Study,
Refinery,
PSM,
PSM Review,
OSHA,
PSM Audit,
Layers of Protection Analysis,
Mitigation,
LOPA
The Opportunity:
A major US refinery used a competing engineering contractor to perform a flare and relief systems analysis. Upon completion of the project, the refinery was left with a list of facility upgrades that management deemed excessive. Smith & Burgess was hired to review the relief and flare systems documentation and provide engineering solutions that met corporate and industry requirements.
Read More
Topics:
Pressure Relief Valves,
Relief Systems,
Flare Mitigation,
Action Item Resolution,
Case Study,
Refinery,
Engineering Review,
PRV Study,
Third Party Review,
Overly Conservative Assumptions,
PRV,
Relief System Design,
Relief Systems Revalidation,
Relief Valve Mitigation,
Mitigation
The Opportunity:
Over the course of a four year time period, a major United States refinery was inundated with over 1,000 action items and asked Smith & Burgess to provide recommended resolutions.
Read More
Topics:
Action Item Resolution,
Case Study,
Refinery,
PSM,
PSM Review,
PSM Audit,
Mitigation
The Opportunity:
The Process Superintendent at a large specialty chemical manufacturing complex had over 600 open action items that were past due and needed direction on how to close them. The action items were assigned to the unit engineers who were unable to dedicate the necessary time.
Read More
Topics:
Action Item Resolution,
Case Study,
Refinery,
PSM,
PSM Review,
PSM Audit,
Mitigation