The Opportunity:
A recent audit of a “rebuild” design package for a major Asian gas plant identified that the EPC may have failed to follow company or industry standards. The owner needed an engineering review of the entire facilities’ relief systems designs prior to their start up in two months. Any deficiencies in company or industry standards needed to be addressed prior to the facilities’ start up.
Read More
Topics:
Pressure Relief Valves,
Relief Systems,
Case Study,
Engineering Review,
Gas Plant,
PRV Study,
Third Party Review,
PRV,
Relief System Design
The Opportunity:
Regulators will often require that a facility review their process safety management systems on a routine basis. These audits can be performed with internal or external resources. A PSM covered gas plant in the U.S. wanted to hire a consultant to perform an audit. Furthermore, the site wanted the results presented in such a way that they could understand and improve upon the shortfalls of their PSM systems. Based on conversations with other gas plants in the region, the site selected Smith & Burgess to perform the audit.
Read More
Topics:
Process Safety Management,
Case Study,
RAGAGEP,
PSM,
PSM Review,
Industry Compliance,
Compliance,
PSM Audit,
Gas Plant,
Regulatory Compliance,
Gap Assessment,
Engineering Standards