<img src="https://secure.7-companycompany.com/796766.png" style="display:none;">

Smith & Burgess' Blog

Top 5 "RAGAGEP Deviations" in New Construction

Posted by Dustin Smith, P.E. on Aug 28, 2018 9:51:00 AM
 

Anyone tasked to start up a unit knows the engineers who designed it rarely miss a thing...

Every bleeder valve is in the right place, spectacle blind turned correctly, and bypass line scrutinized. So why would the flare and relief systems design be any different? The truth is that they are not. Engineering Firms today have perfected the art of throwing waves of engineers on design-build projects. Unfortunately for those engineers, relief and flare system designs are governed by a maze of regulations, codes, standards, and guidelines (collectively known as Recognized and Generally Accepted Good Engineering Practice or RAGAGEP). Experienced Project Managers understand that relief and flare specialists are needed to ensure their projects are safely and properly designed before any construction occurs.

Read More

Topics: Did You Know?, Process Safety Management, Detailed Engineering, Maintenance Operation Studies, Relief System Documentation, Process Safety Optimization

 Safety Knowledge Should be Shared...

“It should not be necessary for each generation to rediscover the principles of process safety which the generation before discovered. We must learn from the experience of others rather than learn the hard way. We must pass on to the next generation a record of what we have learned.” - Jesse C. Ducommun, Safety Pioneer
 
As Process Safety engineers and consultants, we believe our unique position creates a responsibility for Smith & Burgess to share our years of accumulated safety knowledge.


>>> Keep up-to-date with our latest Process Safety knowledge, research, and content by subscribing below. >>>

Subscribe Here!

Recent Posts

Post By Topic

See all